Regent Street Building Wrap Installation

  • DATE: Autumn 2013
  • CLIENT: Service Graphics
  • WORK COMPLETED: Installation of framework and building wrap

These buildings on London’s Regent Street were being completely refurbished with only the exterior facades being retained.To mask the site and limit any debris, a steel frame was erected and Service Graphics were tasked with providing a building wrap and system to fix to the steel frame. SG then employed Hi-Maintenance to carry out the installation of the framework and fabric sections. All works were carried out through the night, meaning short shifts and efficient working methods to maximise the available time. Liasing with the main contractors, we co-ordinated the traffic management, installation of the steel and aluminium frame components, and the installation and tensioning of all banner sections.

The installation was carried out using a combination of roped access and MEWP access. The bays are up to 6m in width and are joined seamlessly to create a complete image.